I get asked this all the time, and the short answer is spring or fall.
Exterior paint is picky about two things. The first is temperature: most paints want the wall above 50 degrees for a day or two after they go on. The second is how dry the wood is. Cedar or pine that just soaked up a week of rain will push that moisture right back out through fresh paint.
Here in the Lehigh Valley, that gives you two good stretches a year.
Spring, late April into June
By then the wood has dried out from winter and the days are long. This is when I like to do whole houses, porches and decks, because the paint gets weeks of warm weather to cure before the July humidity shows up.
The catch is that spring books up first. If you want a May start, have me out for a walkthrough in March.
Fall, September into early November
Fall is cooler and drier than summer, and the humidity is gone. It's great for trim, doors, shutters and the smaller outside jobs. It works for a whole house too, if the forecast cooperates.
Fall ends once the nights stay below 50. Some years that's mid November, and some years it's Halloween.
What about summer and winter?
In July and August we paint the shady side of the house in the morning and move inside in the afternoon. Winter is inside season: a good time for rooms, cabinets, trim and the shoe molding that goes in after new floors.
If your house is due, book the walkthrough a season ahead of when you want the work done. I'll get you a written quote within 24 hours and hold the date for you.





