When I come out to look at your kitchen, the first thing I do is count. Every door is one. Every drawer front is one. A tall pantry door is one, and a pair of glass doors is two. We call each of those an opening, and that count is your price. The frames, the side panels and the toe kicks come along with it, so the number covers the whole kitchen, not just the doors.
Why I don't price by the size of the kitchen
Two kitchens can take up the same wall and be a completely different amount of work. A galley with sixteen big doors is about a day of prep for us. A kitchen with forty small doors and drawers is closer to three. Every one of those pieces has to be cleaned, sanded, primed and sprayed, so counting them is the honest way to price it. It also means you get the same number whether I'm out on a Tuesday or a Saturday.
What you're paying for
We take the doors and drawers off and number every one, so everything goes back exactly where it came from. Then we clean and sand every surface. That part matters more than people think: the thin film of cooking grease near the stove is what makes paint lift a few months later.
After that comes a bonding primer and two coats of Sherwin-Williams Emerald Urethane. We spray the doors in the shop and paint the frames right there in your kitchen. Most people go with satin. Then it all goes back together, with new hardware if you want it.
What the count doesn't cover
If a cabinet box has swollen from a dishwasher leak, a door has warped out of square, or there's water damage under the sink, that has to be fixed or replaced first. I'll point it out when I'm standing in your kitchen, so you're never surprised by it on the invoice.
I do the count at the walkthrough, and you'll have the written quote within 24 hours.





